Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2024 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information
| Press |
To |
|---|---|
|
Arrow keys |
Move one cell up, down, left, or right |
|
Tab |
Move to the next cell in the same row |
|
SHIFT+Tab |
Move to the previous cell in the same row |
|
Home |
Move to the beginning of the cell |
| End | Move to the end of the cell |
| Page Down | Move to the last row in the register |
| ALT+Down Arrow | Shows the contents of drop-down list choices for applicable fields |
| Numpad * | Expands the subordinate leaves of a tree structure for the currently highlighted branch |
| Numpad + key | Expands the currently highlighted section to display subordinate sections |
| Numpad - key | Collapses the currently highlighted section to remove the display of subordinate sections |
| CTRL+Spacebar | Selects and Deselects a row |
| CTRL+Tab | Toggles the display of open windows |
| ALT | Activates form menus |
| ALT+F4 | Closes active form |
| CTRL+G | Opens the Go To Column navigator |
| Press |
To |
|---|---|
| Left and right arrow keys | Move one character left or right in an editable field |
| TAB | Move to the next editable field in the record |
| SHIFT+TAB | Move to the previous editable field in the record |
| Home | Move to the beginning of the field |
| End | Move to the end of the field |
| ALT+Down Arrow | Shows the contents of drop-down list choices for applicable fields |
| F4 | Shows the contents of drop-down list choices for applicable fields |
| CTRL+Spacebar | Selects and deselects a row |
| CTRL+TAB | Toggles the display of open windows |
| ALT | Activates form menus |
| ALT+F4 | Closes active form |
| CTRL+G | Opens the Go To Column navigator |
All forms have their own set of commands specific to the form. Commands for a form show in the ribbon on contextual tabs (Actions and More Actions) when it is open and the form is active. Click a command on the tab to order it. Some routine commands can be ordered using the standard Windows keystroke combinations (e.g., Ctrl+C, Ctrl+V) or right-click with the mouse when the field is selected.
| F1 | Open to the Help |
| F2 (grid) | Edit cell value: Enter edit mode for cells that are editable on the grid |
| F2 (tree list) | Edit cell value: Enter edit mode for cells that are editable on the tree list |
| F3 | Find next: Finds the next value based on the search criteria |
| F4 (grid) | Show selection register or options in the drop down |
| F5 | Refresh, wherever available |
| F5 | Collapse subordinate Items |
| F6 | Expand subordinate Items |
In the Account Code Utilization Register, F5 can either refresh or collapse subordinates based on whether an account code is selected.
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2024 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information